Installation 5 - 19
Siemens AG SPB7-230.814.01 Page 19 of 24 Opdima
Medical Solutions Rev. 01 10.04 CS PS 24 Installation
Installation of monitor 5
Monitor type: Siemens TFT-LCD monitor 1897
Material required: Mains cable, Cable BNC to HD15 or 13W3(Sun).
Proceed as follows to install the monitor:
1. Unpack the monitor and place it on top of the workstation.
2. Connect the monitor to the workstation with the accompanying cables to the
connectors on the backside of the monitor according to Fig. 20.
Fig. 20 Connectors between workstation and monitor
3. Start up the workstation and log in as service, select service and
start Advanced service
3 Software Upgrade
6 Miscellaneous
5 Select Monitor
type: 67 Hz SunBlade 150.
Select Apply and close to close down the rest of the windows.
4. Log out and log in again as service.
Fine adjusting the monitor settings 5
Read the monitor manual “High-Resolution 18” LCD Monitor SCD 1898-0” (delivered with
the monitor) and especially the chapter for OSD (On Screen Display).
Use the SMPTE test pattern image as reference when calibrating the image geometry of
the monitor (see the Opdima Quality Control Manual on how to do so). To compensate for
movement in the grid pattern, use frequency/phase under others (settings).
OPD00631
Sun Ultra 1, Sun Ultra 10:
13W3-4 BNC, Siemens Part. no. 66 33 684
R: Red cable
G: Green cable
B: Blue cable
H (H/W): Sync, black cable
SunBlade 150:
HD15(VGA)-5 BNC, Siemens Part. no. 66 33 676
R: Red cable
G: Green cable
B: Blue cable
H (S): Horizontal/(vertical) sync, white cable
V: Vertical sync, black cable
Network cable: 230 Volt