EasyManua.ls Logo

Siemens S7-400 - Page 260

Siemens S7-400
316 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Assembling and Installing Systems
A-8
S7-400 and M7-400 Programmable Controllers Hardware and Installation
A5E00069481-04
Rule 4: Special EMC Measures
Employ special EMC measures for particular applications (see Section 4.11).
Fit suppressors to all inductors which are not controlled by S7-400 modules.
Use incandescent bulbs or suppressed fluorescent lamps in the immediate
vicinity of your controller for illuminating cabinets or housings.
Rule 5: Standard Reference Potential
Create a standard reference potential; ground all electrical apparatus if possible
(see Sections 4.10 and 4.12).
Install equipotential bonding conductors of sufficient rating when potential
differences exist or are expected between sections of your system.
Use specific grounding measures. Grounding the control system is a protective
and functional measure.
Connect the system sections and cabinets containing central racks and
expansion racks to the grounding/protective ground system in a star
configuration. This prevents the formation of ground loops.
See also
Cable shielding, page A-13
Cabling outside buildings, page A-19
Cabling inside buildings, page A-17
Mounting of programmable controllers for EMC, page A-9

Table of Contents

Other manuals for Siemens S7-400

Related product manuals