EasyManua.ls Logo

Siemens Sentron 7KN POWERCENTER 1000 - Install 5 ST3 COM Auxiliary Switch and Fault Signal Contact

Siemens Sentron 7KN POWERCENTER 1000
112 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation and connection
4.2 Device installation
Circuit protection devices with communication and metering function
System Manual, 06/2021, L1V30827018B-01
27
4.2.2 Install 5ST3 COM auxiliary switch and fault signal contact
Prior to wiring, first mount the auxiliary switch/fault signal contact to the main unit or fasten
together on to the DIN rail. This helps reduce the risk of injury.
The 5ST3 COM auxiliary switch/fault signal contact must be connected or disconnected from
the supply voltage lines when completely assembled.
The 5ST3 COM auxiliary switch / fault signal contact can be mounted to the following main
units:
Designation
Article numbers
Device protection switches or miniature circuit breaker
5SL, 5SY, 5SP
Residual current circuit breakers or RCBO
5SU1, 5SV
Other switching devices
5TL, 5ST30

Table of Contents

Related product manuals