4.1 Operating Notes
55Power Meter SICAM P 7KG7750/55, Manual
E50417-B1076-C340-A6, Edition 09.2013
4.1.3 Notes on Parameterization
The measured quantities offered for selection in the screens depend on the connection type
selected.
The numbers entered are checked for plausibility and the note: "ERR" is displayed if required.
The input value is then set to the maximum value.
If the power supply voltage is switched off during programming, the message illustrated
below appears when the device is restarted. Therefore, the power supply voltage should only
be switched off in level 1 (measuring screens).
Select No via the buttons to
retain the settings as they existed prior to the
loss of power supply voltage.
Choose Yes by pressing the ENTER button
to restore the default settings.
Attention!
Parameter incorrect
reset?
No Yes
(arrow) (Enter)
Note
This means, that you should always leave the parameter screens completely (OK or Cancel) until
the measurement screens are displayed again. This ensures that all parameters will be accepted
by the device.
Note
Please check the parameters and the adjustment data afterwards, to ensure the correct function
of the SICAM P.
If you have adjusted the device manually (refer to chapter 6), the adjustment data will not be
overwritten by default settings.