7 Operation at Use of a PC
7.3 Configuration of the Device
157SICAM P850/P855, 7KG85xx, Device Manual
E50417-H1040-C482-A6, Edition 10.2018
Recording Power Quality Data
When the device is started for the first time, it is necessary for the recording of power quality data that the Time
synchronization of the device is set to the current time first
. If the time is incorrect, the power quality measure-
ments do not conform to the current time. Proceed as follows:
Refresh the time via Ethernet NTP or Field bus in line with Time Synchronization or with the device-
internal clock in line with Date/Time.
Configure all necessary parameters (for example, AC measurement, Communication, etc.) on the relevant
tabs, except for
the Recording parameters settings.
When setting the parameters, make sure that the settings are consistent with each other (for example,
setting of the flicker lamp model consistent with the primary nominal voltage).
At last
, parameterize the Recording parameters and activate the settings.