EasyManua.ls Logo

Siemens SIMATIC ET 200SP HA - Minimum Clearances in the Control Cabinet

Siemens SIMATIC ET 200SP HA
186 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5.2 Minimum clearances in the control cabinet
You must ensure the following clearances when installing the rail:
Table 5-1 Minimum clearances for the installation of the IO device in the control cabinet
Upper
40 mm
Left
10 mm
Right
10 mm
Lower
20 mm
The mounting depth of the ET 200SP HA results from the interlocking components (standard rail, carrier
module, terminal module and I/O module). The mounting depth is 162 mm. There should be at least 10
mm of space in front of the front panel of the modules.
Ensure the heat dissipation.
Observe the minimum clearances of the IO device in the control panel or to surrounding components.
Leave sufficient space for the wiring and the communication cable connection.
See also
Mechanical and climatic environmental conditions (Page 143)
Installation
5.2 Minimum clearances in the control cabinet
ET 200SP HA Distributed I/O system
60 System Manual, 08/2019, A5E39261167-AD

Table of Contents

Other manuals for Siemens SIMATIC ET 200SP HA

Related product manuals