Application planning
5.5 Scope of delivery
SIMATIC PN/J1939 LINK
Operating Instructions, 12/2018, A5E45307564-AA
31
● PN/J1939 LINK
● 2 securing collars for the Ethernet connections (installed on the device in the delivery
state)
● Compact operating instructions
● CD/DVD with license terms
Unpacking and checking the delivery
1. Unpack the device.
2. Check the delivery for completeness.
3. Check the device for transport damage by visual inspection.
Damage to the system
Damaged parts can result in damage to the system. Do not use devices that show evidence
of damage!