G
General inspection, 78
Grounding conductor
Connecting, 54
Cross section, 53
H
Hazardous substances, 15
Hearing damage, 15
High-voltage motor
Switching, 24, 63
Hot surfaces, 15
I
Inspection
Faults, 70, 77
Installation
Initial inspection, 77
Installing the protective ring, 88
Insulation resistance, 34, 61, 69, 84
measure, 35
Interference immunity, 17
Internal fan, 85
L
Leakage water, 78
Lifting eyebolt, 26, 27, 41, 42
Long-term storage, 30
M
Machine
Aligning to the driven machine, 47
Mounting, 46
setting down, 44
Machine design
IEC, 19
Machinery Directive, 13
Maintenance
Maintenance intervals, 75
Mechanical faults, 71
Minimum air clearances, 56
More information, 99
Mounting-foot hole dimensions, 38
N
Noise emissions, 15
Noise protection measures, 22
O
On-site service, 99
Operating mode, 21
Output element, 40
Overspeed, 21
Overvoltage, 63
P
Paint finish, 20
Paint system, 84
Paintwork damage, 84
Polarization index, 34, 37, 61, 69, 84
Positioning, 47
Precision alignment, 47
Pressure relief device, 57
Property class, 46
Protective ring, 87
Q
Qualified personnel, 14
R
Radial forces at the shaft extension, 48
Rated voltage, 56
Rating plate, 20
Re-commissioning, 69
Regreasing, 67, 82
Removing spent grease, 83
Repair
Initial inspection, 77
Residual risks, 21
Restriction of certain Hazardous Substances, 95
Risk of explosion, 19
RoHS, 95
Roller bearings
faults, 72
Greasing, 61
Rolling bearings
Inspection, 78
Index
SIMOTICS HV C 1NA14544WA600AG0-Z
108 Operating Instructions 06/2018