EasyManua.ls Logo

Siemens Sinamics G120 CU240S DP - Commissioning with STARTER Software

Siemens Sinamics G120 CU240S DP
238 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Commissioning
4.5 Commissioning with STARTER
Frequency inverter
58 Operating Instructions, 08.10. 2008, t.b.d.
4.5 Commissioning with STARTER
Requirements
The STARTER commissioning tool features a project Wizard that guides you step-by-step
through the commissioning process. Configuring the frequency inverter using the PC is
significantly more user friendly and faster than commissioning using the Operator Panel.
The following is required to commission the frequency inverter via the PC:
A PC connection kit for connecting the inverter to a PC.
Order no.: 6SL3255-0AA00-2AA0
Figure 4-3 PC connection kit
The installed STARTER software.
(supplied with the PC connection kit). You can download the latest version from the
Internet under the following address ().
The motor must be connected to the frequency inverter.

Table of Contents

Related product manuals