Commissioning
4.5 Commissioning with STARTER
Frequency inverter
Operating Instructions, 08.10. 2008, t.b.d.
59
4.5.1 Creating a STARTER project
Description
A frequency inverter can be parameterized in a user-friendly fashion using the Project
Wizard. The commissioning procedure described here follows the Project Wizard. The PC
communicates with the frequency inverter via the USS interface.
Switch on the frequency inverter supply voltage
Launch the STARTER commissioning tool.
Use the Project Wizard and click on the "Find drive units online ..."
Figure 4-4 Start field
In the screen that follows (not shown here), enter a meaningful name into your project,
e.g. "Basic Commissioning" and click on "Continue". The following dialog box is
displayed.
Figure 4-5 Setting the PC interface