EasyManua.ls Logo

Siemens SINAMICS G120 CU250S-2 Series - Installing; Snapping the Control Unit onto the Power Module

Siemens SINAMICS G120 CU250S-2 Series
26 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CU250S-2 Control Units
Compact Operating Instructions, 05/2014, A5E32899990B AB
7
Installing
3
3.1
Snapping the Control Unit onto the Power Module
Installing the Control Unit on an IP20 Power Module
Procedure
Proceed as follows to connect Power
Modules and Control Units:
1.
Locate the lugs at the rear of the Control
Unit in the matching recesses of the
Power Module.
2.
Mount the Control Unit onto the Power
Module so that it audibly snaps into place.
The Power Module and the Control Unit are now connected with one another.
To remove the Control Unit, press on the release button on the Power Module and withdraw
the Control Unit.
Permissible Power Modules
You may operate the Control Unit with the following Power Modules:
PM240
PM240-2
PM250
PM260
PM340 1AC

Related product manuals