Commissioning
5.3 Procedure for commissioning via STARTER
Inverter chassis units
164 Operating Instructions, 07/2016, A5E00331449A
Results of the previous steps
You have created a drive unit project offline using STARTER.
You have saved the project data to the hard disk on your PC.
You have transferred the project data to the drive unit.
You have saved your project data to your drive's memory card so that it is backed up in
the event of a power failure.
Note
Tip for working with STARTER
The STARTER commissioning tool s
upports complex drive system operations.
If you are confronted with any system conditions in online mode that are beyond your
control, you are advised to delete the drive project from the project navigator and carefully
create a new project in STARTER usin
g the appropriate configuration data for your
application.
5.3.4
Commissioning with STARTER via Ethernet
Description
The Control Unit can be commissioned using a programming device (PG/PC) via the
integrated Ethernet interface. This interface is provided for commissioning purposes only and
cannot be used to control the drive in operation.
A routing of the integrated Ethernet interface via any inserted CBE20 expansion card is not
possible.
Preconditions
STARTER as of version 4.1.5
Control Unit CU320-2 DP as of device version "C", CU320-2 PN Control Unit