Commissioning
5.5 First commissioning with the AOP30
Inverter chassis units
Operating Instructions, 07/2016, A5E00331449A
171
5.5
First commissioning with the AOP30
5.5.1
First commissioning
Start screen
When the system is switched on for the first time, the Control Unit is initialized automatically.
The following screen is displayed:
Figure 5-39 Initial screen
When the system boots up, the parameter descriptions are loaded into the operating field
from the CompactFlash card.
Figure 5-40 Load the parameter descriptions while booting up the system