EasyManua.ls Logo

Siemens SINAMICS G130 - 4 Electrical Installation

Siemens SINAMICS G130
610 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Inverter chassis units
Operating Instructions, 07/2016, A5E00331449A
47
Electrical installation
4
4.1
Chapter content
This chapter provides information on the following:
Establishing the electrical connections for the Power Module, the CU320-2 Control Unit,
and the optional TM31 Terminal Module and SMC30 Sensor Module.
Adjusting the fan voltage and the internal power supply in line with local conditions
(supply voltage)
The interfaces for the CU320-2 Control Unit, TM31 Terminal Module, and SMC30 Sensor
Module.
4.2
Preparation
Required tools
You require the following tools for the electrical installation:
Standard set of tools with screwdrivers, screw wrenches, socket wrenches, etc.
Torque wrenches 1.5 Nm up to 100 Nm
600 mm extension for socket wrenches

Table of Contents

Other manuals for Siemens SINAMICS G130

Related product manuals