Procedure
Test the shutdown function for the operation of the "Safe torque off" function. Proceed as
follows:
1.
Check the setting of t
he bail switch S3 on peripheral board DI/DO:
open: for single-circuit trip
closed: for two-circuit trip
2.
Connect power to the inverter.
3.
Check parameter "P
-INVERTER DATA/STO":
"X2:20": for single-circuit trip
"X2:20/24": for two-circuit trip
4.
It i
s advantageous if you track the "Status" inverter actual value. You can either do this
in the display, if you parameterize this actual value temporarily in the 4th status line or in
the IMS, if you are connected with a PC.
5.
If required, enter the necess
ary switch-on commands so that the inverter is at least in
the ready state, i.e. is in the "Status
= Rdy.f.work".
The "READY" LED is lit.
6.
(Simultaneously) open the safety circuit(s), that is/are connected as follows:
For single-circuit trip at -X2:19/:20.
For a two-circuit trip, additionally at X2:24/:3
The inverter switches into the "Switch interlock" status, LED "READY" goes dark.
The "Safe torque off" "active" message is displayed.
7.
By pressing "RESET", attempt to exit the state.
It is not permis
sible that the inverter exits the "Switch interlock" state.
The message "Safe torque off" "active" must remain active.
8.
Connect the safety circuit(s) at
X2:19/:20 and possibly at X2:24/:3.
The inverter initially stays in the "Switch interlock" state;
however, the display changes
to "!! OFF2 !!" After STO act.".