Installation without a crane
Remove the terminal cover that is plugged in on the top and mount it after the 3RW55 soft
starter has been mounted completely (Page 76).
Screw the lower 2 screws into the mounting plate .
Ensure that both screws protrude at least 4 cm and then place the 3RW55 soft starter onto
the 2 lower screws from above using the handles provided (2 people).
Tilt the 3RW55 soft starter up so that it is resting level against the mounting plate and
tighten all 4 screws with the speci󹪝ed torque .
Installation with a crane
Remove the terminal cover that is plugged in on the top and mount it after the 3RW55 soft
starter has been mounted completely (Page 76).
Screw the lower 2 screws into the mounting plate . Make sure that both screws are
protruding at least 4 cm.
Use a crane load attachment with 4 hooks to lift the 3RW55 soft starter out of the packaging.
Attach the hooks of the crane load attachment to the cutouts and . Lift the 3RW55 soft
starter horizontally out of the packaging and set the 3RW55 soft starter down on a horizontal
surface.
Use a crane load attachment with 2 hooks to mount the 3RW55 soft starter. Attach the hooks
of the crane load attachment to the cutouts .
Mounting and dismantling
4.3 Mount the 3RW55 and 3RW55 Failsafe soft starters on a level surface
SIRIUS 3RW55 and 3RW55 Failsafe Soft Starters
Equipment Manual, 02/2022, A5E35630887002A/RS-AF/006 59