Page 86 COMMUNICATIONS FOR SITRANS LUT400 (HART) – MANUAL A5E33701270
mmmmm
Operation - AMS
Pumps
Basic Setup
Basic Setup (tab)
Long TAG 3.1.2
Pump Control Enable 2.7.1.1
Relay Pump 1 2.7.1.2
Relay Pump 2 2.7.1.3
Pump Control Mode
ON Setpoint Pump 1 2.7.1.6
OFF Setpoint Pump 1 2.7.1.7
ON Setpoint Pump 2 2.7.1.8
OFF Setpoint Pump 2 2.7.1.9
Service Ratio Pump 1 2.7.1.10
Service Ratio Pump 2 2.7.1.11
Modifiers
Modifiers (tab)
Long TAG 3.1.2
(Wall Cling Reduction) Enable 2.7.2.1.1
Level Setpoint Variation 2.7.2.1.2
(Pump Run-On) Enable 2.7.2.3.1
Run-On Interval 2.7.2.3.2
Run-On Duration Pump 1 2.7.2.3.3
Run-On Duration Pump 2 2.7.2.3.4
Delay Between Starts 2.7.2.4.1
Power Resumption Delay 2.7.2.4.2
(Energy Savings) Enable 2.7.2.2.1
Peak Lead Time 2.7.2.2.2
Peak 1 Start Time 2.7.2.2.3
Peak 1 End Time 2.7.2.2.4
Peak 2 Start Time 2.7.2.2.5
Peak 2 End Time 2.7.2.2.6
Peak 3 Start Time 2.7.2.2.7
Peak 3 End Time 2.7.2.2.8
Peak 4 Start Time 2.7.2.2.9
Peak 4 End Time 2.7.2.2.10
Peak 5 Start Time 2.7.2.2.11
Peak 5 End Time 2.7.2.2.12
Peak ON Setpoint Pump 1 2.7.2.2.13
Peak OFF Setpoint Pump 1 2.7.2.2.14
Peak ON Setpoint Pump 2 2.7.2.2.15
Peak OFF Setpoint Pump 2 2.7.2.2.16
Totalizers
Configure/Setup Function Group (cont’d)
parameter
number