Page 18 of 52 7482255 Rev 01 Siemens
October 2002
Installing the Color Printer and the VCR
24. Using the diagrams provided in Figure 4-15, connect the cables between
the rear side of the CP900 and the interface panel and between the rear
side of the P91W and the interface panel.
25. Verify that all cables are safely routed around the fan that is located at the
rear of the CP900.
26. Secure the OEM bay to the system, using the four M4 X 8 binding head
screws with external lock washers that were removed.
27. Re-install the top cover on the system.
28. Re-install the front cover on the system.
4.3 Installing the VCR
Use the following instructions to install the SVO-9500 VCR in the OEM bay of
the G50 or the G60 S.
1. De-energize the system.
2. Place SVO-9500 VCR upside down on a flat surface.
3. Remove four rubber feet from the bottom of the VCR.
Note: If previously installed options occupy the OEM bay, install the VCR on top
of the OEM bay as indicated in Figure 4-12.
!
Warning: Use threaded fasteners of the length cited here to avoid damaging or shorting under-
lying equipment. See "Fastener Reference" (page H-1).