EasyManua.ls Logo

Siemens SONOLINE G50 - Installing the E Module; Confirming the Operation of the E Module

Siemens SONOLINE G50
234 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 46 of 52 7482255 Rev 01 Siemens
October 2002
Removing and Installing the E Module
10.3 Installing the E Module
Install the E module by performing, in reverse order, the procedures provided in
"Removing the E Module" (page 4-44).
10.4 Confirming the Operation of the E Module
1. Connect the system power cable to a properly grounded outlet.
2. Connect a transducer to the G50 or the G60 S.
3. Turn the power switch On.
4. Turn the Standby switch On.
5. Confirm that a B-mode image is displayed on the monitor.
!
Caution: Use fasteners of the correct length to prevent damage to underlying
equipment. See "Fastener Reference" (page H-1).

Table of Contents

Other manuals for Siemens SONOLINE G50

Related product manuals