Service and maintenance
10.2 Maintenance work
ULTRAMAT 23
Manual, 3/2016, A5E37100388-003
175
Proceed as follows to install the new sensor:
1. Tighten the new H
2
S sensor by hand in the holder up to the mechanical limit (shaded)
Figure 10-2 Sensor holder
(shaded)
2. Plug the cable with the connector onto the sensor.
3. Close the analyzer by screwing tight the cover.
4. Switch the analyzer on and wait for the warming-up phase.
5. Check for leaks in the device
This is described in section Leaks in the gas paths (Page 81)
6. Calibrate the H
2
S sensor as described in section Calibration: H2S sensor (Page 118)
7. Enter the installation date with the menu command "H
2
S Installation date".
The analyzer is then ready for use again.