Summary

Product Overview

Equipment Appearance and Dimensions

Shows the physical appearance and dimensions of the SigenStor unit.

Installation Environment and Positioning

Installation Environment Requirements

Specifies the required environmental conditions for safe and effective installation.

Installation Position Guidelines

Details safe and recommended positions for equipment installation.

Mounting Surface Requirements

Outlines the specifications for the surface used for mounting the equipment.

Inverter and Battery Pack Installation Methods

Floor Installation Guide

Step-by-step instructions for installing the unit on the floor.

Wall Installation Guide

Detailed guide for mounting the inverter and battery pack on a wall.

Cable Connection and Component Installation

Recommended Cabling Installation Schemes

Overview of various cable routing schemes and types for connections.

Protective Ground Cable Connection

Instructions for properly connecting the protective ground wire.

AC Output Cable Connection

Steps for connecting the AC output cable to the distribution panel.

RS485 Signal Cable Connection

Details on connecting the RS485 communication cable for sensors.

RJ45 Network Cable Connection

Information on connecting the RJ45 cable for network communication.

DC Input Cable Connection

Instructions for connecting the DC input cable from the PV string.

Communication Module Installation

Sigen CommMod Installation

Guide for installing the Sigen CommMod for 4G communication.

WLAN Antenna Stick Installation

Steps for installing the WLAN antenna for wireless communication.

Post-installation Checks

Installation Verification Checklist

List of essential checks to perform after installation.

Decorative Cover Installation

Decorative Cover Installation Steps

Procedures for installing decorative covers on the unit.

Equipment Power-On and Status Indicators

Equipment Power-On Procedure

Steps to turn on the equipment and check its status.

Understanding Indicator Status

Explanation of indicator lights and their meaning for system status.

mySigen App System Setup

Download and Create New System

Guide to downloading the app and creating a new system.

Sigenergy SigenStor-5S-5 Specifications

General IconGeneral
Nominal Voltage51.2 V
Nominal Capacity100 Ah
Usable Capacity5.12 kWh
Max. Continuous Charging Current50 A
Operating Temperature-10°C to 50°C
ScalabilityUp to 16 units in parallel
Protection LevelIP65
Depth of Discharge90%
Warranty10 years
Operating Voltage Range44.8 - 57.6 V
Cycle Life6000 cycles
CommunicationCAN, RS485
Cell TypeLiFePO4