Instruction, use and maintenance manual Pag. 27/39
BMR 20-20H-30 Planetary Mixer
14.4. System checks
Periodically inspect the operation of machine automation and its earthing. Inspect the methods of operation, the
safety functions, the contacts on the terminal board and the integrity of the cables, of the luminous indicators and of
the earthing.
VERIFICATION:
INTERVAL METHOD
a F, M
14.5. Routine maintenance
DO NOT CARRY OUT ANY MAINTENANCE OR CLEANING WITH POWER ENGAGED. The
machine does not require particular maintenance operations. Check belt wear after the first three
months of operation.
Periodically, 4 ¸6 months, grease and oil the points shown on the following diagram (use MOLYKOTE
165 LT grease).
1) GREASE NIPPLES
2) GREASE MANUALLY
Should the power cable be damaged, replace it with a H07RN/F cable with a 3x1.5 mm cross-section
.
Cleaning: the machine is not spray
proof; it must not be cleaned with running water. Clean with
a damp rag and mild cleaning solutions, for example castile soap degreasers.