nection pipe with insulating pipe, and
insulating pipe
1. Connect the drain hose to the outlet pipe of
outlet
pipe
drain hose
drain hose
tape
outlet pipe
drain hose
insulating pipe
Add insulating pipe in the indoor
The plastic expansion particles are
1. Open the panel, remove the screw
on the wiring cover and then take
wiring cover
screw
panel
Step seven: connect wire of indoor unit
4. Wrap the indoor pipe and joint of con-
then wrap it with tape.
Step six: install drain hose
Installation of indoor unit
torque wrench
open-end
wrench
indoor pipe
pipe
union nut
Hex nut diameter Tightening torque (N
.
m)
Φ 6
Φ 9.52
Φ 12
Φ 16
Φ 19
30~40
45~55
60~65
70~75
15~20
indoor unit.
2. Bind the joint with tape.
Note:
drain hose in order to prevent
condensation.
not provided.
down the cover.
25

Other manuals for Sinclair ASH-09AIE2

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Sinclair ASH-09AIE2 and is the answer not in the manual?

Sinclair ASH-09AIE2 Specifications

General IconGeneral
BrandSinclair
ModelASH-09AIE2
CategoryAir Conditioner
LanguageEnglish

Related product manuals