Section 04 ENGINE
Sub-Section 09 (ROTARY VALVE, COOLANT PUMP AND RESERVOIR)
04-09-8
1. Position of mark when brass gear disengage worm gear
2. Advanced by 2°
3. Position of mark before installation (about 10 splines from original
position)
1,2, Screw and Rotary Valve Cover
Install O-ring and cover then torque screws to 22
N•m (16 lbf•ft) in a criss-cross sequence.
A16C18A
1
3
2