DA 150B Pad Cooling
Technical User Guide
Question and Answer IconNeed help?

Do you have a question about the Skov DA 150B and is the answer not in the manual?

Skov DA 150B Specifications

General IconGeneral
BrandSkov
ModelDA 150B
CategoryAccessories
LanguageEnglish

Summary

Product and Documentation Changes

Safety and Usage Recommendations

Highlights safety precautions for installation, operation, and service by trained staff, emphasizing emergency units and alarm systems.

Electrical Equipment Standards

Specifies that qualified personnel must perform electrical work per national and international standards like EN 60204-1 and EU rules.

Power Supply Isolator Requirement

Mandates a power supply isolator for each motor and power supply for safe electrical work; SKOV A/S does not supply it.

Copyright and Liability

States all rights reserved, no reproduction without permission, efforts for accuracy, but no liability for reliance on information.

Product Description

Overview of DA 150B Pad Cooling System

Provides a general overview of the DA 150B pad cooling system, its components, and available part numbers for basic 6m and 3m configurations.

DA 150B Pad Cooling, Supply Unit

Details the DA 150B pad cooling supply unit, listing available part numbers and components included in basic kits.

DA 150B Pad Cooling, Middle/End Kit 6 m

Describes the DA 150B pad cooling middle/end kit for 6m systems, listing part numbers and detailed components.

DA 150B Pad Cooling, Middle/End Kit 3 m

Details the DA 150B pad cooling middle/end kit for 3m systems, including part numbers and component breakdowns.

DA 150B Pad Cooling, Extension 3m

Explains the use of the DA 150B pad cooling extension 3m for systems longer than 6m, up to a total length of 24m.

DA 150B Pad Cooling, Extension 2x3m

Describes the DA 150B pad cooling extension 2x3m, used for extending systems beyond 6m, with a maximum total length of 24m.

DA 150B Pad Cooling 3 m Corner Connection

Details the 3m corner connection for DA 150B pad cooling, allowing mounting around building corners and extensions up to 12m.

DA 150B Pad Cooling Corner Connection Kit

Covers the corner connection kit V2 for DA 150B pad cooling, used for connecting 3m corner connections and extensions up to 12m.

Pad Components

Lists various pad types by size, material, and specifications, including different stripe patterns and coatings.

DA 150B Pump

Details the available DA 150B pump models, specifying voltage and frequency ratings for different versions.

Check Valve Kit

Provides information on the DA 100B/150B Pad cooling check valve kit, listing its item number.

DA 150B Glue Kit

Details the DA 150B Glue Kit for max. 12m, listing components like glue, cleaning fluid, brush, and safety advice.

General Information

Recommended Tools

Lists essential tools required for the installation of SKOV pad cooling systems, including saws, drills, ladders, and measuring instruments.

Safety Guidelines - Intended Use

Provides critical operating instructions for safe system use, emphasizing accident prevention and adherence to general safety regulations.

Electrical System Requirements

Outlines requirements for electrical installation, service, and fault-finding by specialists, emphasizing safety isolators and qualified personnel.

Electrical System Diagrams

Presents circuit diagrams for single-phase 1x230 V and three-phase 3x230 V electrical configurations of the pad cooling system.

Mounting Guide

Total Height of Pad Cooling System, Wall

Illustrates and defines the total height of a wall-mounted pad cooling system, detailing measurements for openings and components.

Total Height of Pad Cooling System, Floor

Shows and explains the total height for a floor-mounted pad cooling system, including wall opening dimensions and component measurements.

Opening for Pad Cooling

Specifies the required measurements for creating the wall opening for the pad cooling system, ensuring correct dimensions and perpendicularity.

Bracket for Water Gutter

Guides the installation of brackets for the water gutter, detailing measurements, alignment with chalk lines, and spacing for optimal support.

Bracket Spacing for Extension Sets

Illustrates bracket spacing for both even and uneven numbers of extension sets, showing dimensions for pad support and supply unit placement.

Water Gutter Installation

Provides instructions on sawing the water gutter to length, mounting the supply unit, and fitting the end cover for proper water containment.

Top Bracket Installation

Explains how to determine the correct position and mount the top bracket, including marking lines and measuring distances for accurate placement.

Water Distribution Pipe Assembly

Details the assembly of the water distribution pipe, including fitting to the supply unit, drilling holes, and connecting pipes with connectors and clamps.

Deflector Installation

Guides the clipping and mounting of deflectors, including drilling holes for water supply and using deflector couplers for connections.

Inner Pad Guide Mounting

Instructs on mounting the inner pad guide by clipping it into the top bracket and assembling pad guides with a coupler.

Piping System Installation

Covers the installation of the 2.5m water pipe for the system, emphasizing clean cuts, beveling, and proper assembly to avoid damage.

Supply Unit Connections

Details connecting the water supply to the unit, mounting the 2" pipe, and cleaning with water via the 3/4" connector.

Check Valve Installation

Explains how to install the check valve, including mounting washers, sealing, and tightening parts for the supply unit tank.

Water Distribution Piping

Guides the mounting of a ball valve for water shut-off, connecting piping to the distribution via elbows, and the central T-glue coupler.

Prior Start-up Adjustments

Details pre-start-up checks, adjusting the floating valve swimmer for water level, and setting the ball valve for correct water quantity.

End Cover with Overflow Protection

Explains the function of the end cover with overflow holes to prevent rain water ingress and maintain optimal water levels.

Covers and End Cover Mounting

Instructs on pressing covers onto the system after gluing, including cutting pad supports and fitting end covers to the wall.

Bleed off Valve Installation

Guides the installation of the bleed off valve and mounting the clamp and tube for water drainage to the system.

Pad Mounting

Details the process of mounting the pads, ensuring correct air flow direction and placement into end covers.

Outer Pad Guide Mounting

Instructs on mounting the outer pad guide by clipping it into the top bracket and securing the pad guide coupler.

Pointing Sealing Edge

Provides methods for pointing sealing edges against walls, whether flat and smooth or uneven, for proper air sealing.

Glue Instruction

Glued Connections Procedure

Recommends 'Tangit' adhesive for glued connections, detailing pipe preparation, application, setting times, and pressure testing requirements.

Safety Advice for Tangit PVC-U/C

Provides hazard identification, handling precautions, personal protection measures, and first aid for Tangit PVC-U/C adhesive.

Glue Water Gutter and Pipes

Guides the gluing process for water gutters and pipes, emphasizing waterproof connections, adhesive application, and drying procedures.

Maintenance Instructions

Maintenance Routines

Details regular checks and cleaning procedures for the pump filter and the overall system to ensure optimal performance and longevity.

Technical Data

Load on the Bracket

Specifies the weight load capacities for both bottom and top brackets mounted at a standard distance of 0.75 meters.

Water Quality Requirements

Outlines the need for fresh water without bacteria and specifies acceptable limits for bicarbonate and calcium concentrations.