Highlights safety precautions for installation, operation, and service by trained staff, emphasizing emergency units and alarm systems.
Specifies that qualified personnel must perform electrical work per national and international standards like EN 60204-1 and EU rules.
Mandates a power supply isolator for each motor and power supply for safe electrical work; SKOV A/S does not supply it.
States all rights reserved, no reproduction without permission, efforts for accuracy, but no liability for reliance on information.
Provides a general overview of the DA 150B pad cooling system, its components, and available part numbers for basic 6m and 3m configurations.
Details the DA 150B pad cooling supply unit, listing available part numbers and components included in basic kits.
Describes the DA 150B pad cooling middle/end kit for 6m systems, listing part numbers and detailed components.
Details the DA 150B pad cooling middle/end kit for 3m systems, including part numbers and component breakdowns.
Explains the use of the DA 150B pad cooling extension 3m for systems longer than 6m, up to a total length of 24m.
Describes the DA 150B pad cooling extension 2x3m, used for extending systems beyond 6m, with a maximum total length of 24m.
Details the 3m corner connection for DA 150B pad cooling, allowing mounting around building corners and extensions up to 12m.
Covers the corner connection kit V2 for DA 150B pad cooling, used for connecting 3m corner connections and extensions up to 12m.
Lists various pad types by size, material, and specifications, including different stripe patterns and coatings.
Details the available DA 150B pump models, specifying voltage and frequency ratings for different versions.
Provides information on the DA 100B/150B Pad cooling check valve kit, listing its item number.
Details the DA 150B Glue Kit for max. 12m, listing components like glue, cleaning fluid, brush, and safety advice.
Lists essential tools required for the installation of SKOV pad cooling systems, including saws, drills, ladders, and measuring instruments.
Provides critical operating instructions for safe system use, emphasizing accident prevention and adherence to general safety regulations.
Outlines requirements for electrical installation, service, and fault-finding by specialists, emphasizing safety isolators and qualified personnel.
Presents circuit diagrams for single-phase 1x230 V and three-phase 3x230 V electrical configurations of the pad cooling system.
Illustrates and defines the total height of a wall-mounted pad cooling system, detailing measurements for openings and components.
Shows and explains the total height for a floor-mounted pad cooling system, including wall opening dimensions and component measurements.
Specifies the required measurements for creating the wall opening for the pad cooling system, ensuring correct dimensions and perpendicularity.
Guides the installation of brackets for the water gutter, detailing measurements, alignment with chalk lines, and spacing for optimal support.
Illustrates bracket spacing for both even and uneven numbers of extension sets, showing dimensions for pad support and supply unit placement.
Provides instructions on sawing the water gutter to length, mounting the supply unit, and fitting the end cover for proper water containment.
Explains how to determine the correct position and mount the top bracket, including marking lines and measuring distances for accurate placement.
Details the assembly of the water distribution pipe, including fitting to the supply unit, drilling holes, and connecting pipes with connectors and clamps.
Guides the clipping and mounting of deflectors, including drilling holes for water supply and using deflector couplers for connections.
Instructs on mounting the inner pad guide by clipping it into the top bracket and assembling pad guides with a coupler.
Covers the installation of the 2.5m water pipe for the system, emphasizing clean cuts, beveling, and proper assembly to avoid damage.
Details connecting the water supply to the unit, mounting the 2" pipe, and cleaning with water via the 3/4" connector.
Explains how to install the check valve, including mounting washers, sealing, and tightening parts for the supply unit tank.
Guides the mounting of a ball valve for water shut-off, connecting piping to the distribution via elbows, and the central T-glue coupler.
Details pre-start-up checks, adjusting the floating valve swimmer for water level, and setting the ball valve for correct water quantity.
Explains the function of the end cover with overflow holes to prevent rain water ingress and maintain optimal water levels.
Instructs on pressing covers onto the system after gluing, including cutting pad supports and fitting end covers to the wall.
Guides the installation of the bleed off valve and mounting the clamp and tube for water drainage to the system.
Details the process of mounting the pads, ensuring correct air flow direction and placement into end covers.
Instructs on mounting the outer pad guide by clipping it into the top bracket and securing the pad guide coupler.
Provides methods for pointing sealing edges against walls, whether flat and smooth or uneven, for proper air sealing.
Recommends 'Tangit' adhesive for glued connections, detailing pipe preparation, application, setting times, and pressure testing requirements.
Provides hazard identification, handling precautions, personal protection measures, and first aid for Tangit PVC-U/C adhesive.
Guides the gluing process for water gutters and pipes, emphasizing waterproof connections, adhesive application, and drying procedures.
Details regular checks and cleaning procedures for the pump filter and the overall system to ensure optimal performance and longevity.
Specifies the weight load capacities for both bottom and top brackets mounted at a standard distance of 0.75 meters.
Outlines the need for fresh water without bacteria and specifies acceptable limits for bicarbonate and calcium concentrations.