EasyManua.ls Logo

SMA MEDIUM VOLTAGE POWER STATION 500SC-JP - Cable Entry; Inserting the Cables through the Base Plates; Overview of the Base Plates on the MV Power Station; Inserting Cables through the Base Plates of the Inverters

SMA MEDIUM VOLTAGE POWER STATION 500SC-JP
258 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
12.4 Cable Entry
12.4.1 Inserting the Cables through the Base Plates
12.4.1.1 Overview of the Base Plates on the MVPowerStation
The MVPowerStation is fitted with base plates through which the cables are inserted. The cables should be protected
between the foundation and the MVPower Station. Cable protection measures are customer responsibility.
Figure 52: Position of the base plates and openings for cables
Position Designation
A Base plate of the SunnyCentral in the MVPowerStation 1000SC-JP / 1250SC-JP /
1600SC-JP
B Base plate of the SunnyCentral in the MVPowerStation 500SC-JP / 630SC-JP / 800SC-JP
C Base plate of the medium-voltage switchgear:
6 openings for single-core cables; maximum cable diameter: 55mm
D Base plate with cable glands for the data cables and grounding cables:
3 x PG9 for cable diameters from 6mm to 8mm
3 x PG11 for cable diameters from 8mm to 10.5mm
4 x PG16 for cable diameters from 13mm to 16mm
4 x PG21 for cable diameters from 17mm to 20mm
12.4.1.2 Inserting Cables through the Base Plates of the Inverters
Requirement:
The service platform in front of the inverter compartment must be installed.
Procedure:
1. Open the inverter compartment (see Section12.1, page159).
2. Cut the cables to the required length. Allow for some reserve.
12 Periodic Actions
SMA Solar Technology AG
System Manual 167MVPS22JP-SH-en-11

Table of Contents

Related product manuals