12.5 Bolted Connections
12.5.1 Preparing the Grounding and DC Cables for Connection
Connection overview with one two-hole terminal lug for grounding and DC cables
Figure 54: Design of the connection with one two-hole terminal lug
Position Designation
A Nut M12
B Spring washer (29mm)
C Fender washer (32mm)
D Connection busbar
E Tin-plated two-hole terminal lug
F Screw M12