EasyManua.ls Logo

SMA MEDIUM VOLTAGE POWER STATION 500SC-JP - Preparatory Work; Removing the Transport Locks from the Inverter Compartment; Loosening the Tie-Down Straps; Removing the Air Cushion

SMA MEDIUM VOLTAGE POWER STATION 500SC-JP
258 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Task See
Connecting the data cable of the SunnyString-Monitor Section5.7.2.9, page71
Connecting the DC cables for option "Busbar" Section5.6.1, page60
Connecting the DC cables for option "DC fuse" Section5.6.2, page62
Mounting the panels Section12.3.1.2, page164
Closing the base plate Section5.8.1, page71
5.3 Preparatory Work
5.3.1 Removing the Transport Locks from the Inverter Compartment
5.3.1.1 Loosening the Tie-Down Straps
Risk of injury when releasing the tie-down straps
Since there is tension on the tie-down straps, there is a risk of whiplash when they are released. This can result in cuts
or crushing of limbs.
Ensure that the tie-down straps cannot whiplash.
Observe all manufacturer instructions on handling the tie-down straps.
Procedure:
Loosen the tie-down straps.
5.3.1.2 Removing the Air Cushion
In the MVPowerStation with two inverters, the air cushion between the inverters serves as protection during transport.
Procedure:
1. Open the inverter compartment (see Section12.1, page159).
2. Remove the air cushion.
3. Close the inverter compartment (see Section12.1, page159).
5 Installation
SMA Solar Technology AG
System ManualMVPS22JP-SH-en-1152

Table of Contents

Related product manuals