SMA Solar Technology AG Troubleshooting
Technical Description SI5048-TEN093630 203
Interrupt the emergency charge mode, e.g., in order to refill diesel.
1. Press <ENTER> to stop the Sunny Island.
The notification shown here is issued.
2. Press and hold <ENTER>.
The remaining time is shown on the display as
beams.
The emergency charging operation is interrupted.
The notification shown here are issued.
In emergency charge mode process values are shown in the display. Parameters cannot be changed
during the charging process. If the device is restarted, the settings that were saved before the ECM
are loaded.
Premature ending of the emergency charging operation.
In order to exit the emergency charge mode early, the Sunny Island must be restarted with
the "510.01 InvRs" parameter.
Bridge between AC1 and AC2
After emergency charge mode has been completed make sure to remove the bridge
between AC1 and AC2!
Restarting
See the instructions for restarting the device and wait 15 minutes
(see also section 9.5”Reactivating the Device Following Automatic Shutdown” (page63).