6 Maintenance
SMA Solar Technology AG
Maintenance Manual 43SCCPXT-E7-WA-en-37
6.2 Maintenance Schedule and Consumables
6.2.1 Notes on Maintenance Work
Adverse ambient conditions reduce maintenance intervals
Location and ambient conditions influence the maintenance intervals. Note that cleaning and corrosion protection
may be required more frequently depending on the conditions at the installation site.
If the DC subdistribution is subject to adverse ambient conditions, it is recommended to shorten the
maintenance intervals.
SMA recommends an optical inspection every six months to determine the maintenance requirements.
Maintenance report for maintenance
All maintenance work must be documented in a maintenance report. The maintenance report can be found in the
download area at www.SMA-Solar.com.
Consumables and maintenance materials
Only those consumables and maintenance materials not normally included in the standard equipment of an
electrically qualified person are listed. It is taken for granted that standard tools and materials such as torque
wrenches, one-contact voltage testers and wrenches will be available for all maintenance operations.
Spare parts
Only original parts or parts recommended by SMA Solar Technology AG are to be used as spare parts when
replacing components.
Spare parts can be identified via the reference designation and the circuit diagram. The spare-parts list includes
the article numbers of each spare part. For information on a specific article number, contact us (see Section9
"Contact", page68).
6.2.2 Maintenance Work Every 24 Months
Required maintenance materials and tools:
A suitable water-free, heat-resistant lubricant
A testing device approved by the manufacturer of the AC disconnection unit, e.g. TT1 by ABB
Talcum, petroleum jelly or wax for maintaining the seals
Use touch-up sticks, paint brushes, cans of spray paint or 2K-PUR acrylic paint in the appropriate RAL color to
repair small-area surface damage.
Use touch-up paint or 2K-PUR acrylic paint in the appropriate RAL color to repair large-area surface damage.
Use zinc plating with thick-layer passivation to repair damage on the zinc-plated steel frame in the base area, e.g.
LZ-09. Observe the relevant instructions of the manufacturer.
Abrasive cloth
Degreaser
A surge arrester testing device approved by the surge arrester manufacturer
Maintenance work depending on the condition of the inverter
Maintenance with DC voltage present
Task See
Reading off error messages and warnings Section5.2, page30
Checking the DC switchgear Manufacturer documentation
(see Section1.7, page7)*