EasyManua.ls Logo

SMA sunny home manager - Page 135

SMA sunny home manager
144 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Problem Cause and corrective measure
The SunnyHomeManager does not
switch the radio-controlled socket on.
You may have set the radio-controlled socket to Auto-
matic after the beginning of a time period, e.g. the time
period starts at 1:00p.m. and you have set the radio-con-
trolled socket to Automatic after 1:00p.m. If the load
cannot complete its operation within the time period due
to the maximum program runtime, or if the load does not
have the set device operation time available within the
time period, the SunnyHomeManager will not switch the
radio-controlled socket on until the next time period.
Corrective measures:
To set the connected load to start immediately, set
the operating mode of the radio-controlled socket to
Switch on (see Section9.4, page90).
15 Troubleshooting
SMA Solar Technology AG
User Manual 135HoMan_Portal-BA-en-20

Table of Contents

Other manuals for SMA sunny home manager

Related product manuals