Position Designation Explanation
B Add loads Using this button, you can add further loads to the
SunnyHomeManager system.
Smart appliances are recognized automatically by the
configuration wizard and are displayed under Device
Overview > Overview of New Devices. Following suc-
cessful registration, the devices are displayed on the page
Load Overview and Planning in the area Load Over-
view.
C Load list List of loads which have been configured for use with the
SunnyHomeManager.
D Load Symbol and name of the load
E Type of load Type of the load
F Status Status of the load
= OK
Load is fully configured and receives data
= Not active
Load is not assigned to a radio-controlled socket.
= Load is not fully configured
G Configuration
Opens the tab Name of Load, on which you can config-
ure the load properties (see Section9.3, page79).
Load Planning
Load planning provides a graphical overview of the scheduled time periods in which the active
loads must be operated (dark-colored bars) or can be operated (light-colored bars).
"Name of Load"
You can access the tab "Name of Load" by going to the page Load overview and planning,
area Load Overview, and selecting the button Configuration [ ] in the line of the required
load. On the tab "Name of Load", you can configure the properties of the load and time periods
for the load. Depending on the selected load type, you can display and configure different load
properties on the tab page (see Section9.3, page79).
6.8.5 Report Configuration
This page displays whether you have configured any reports to be e‑mailed by SunnyPortal, and if
so which report types (see Section11.3, page102).
6.8.6 User Management
Requirements for displaying the page:
☐ You must have the user role Installer or PV System Administrator (see Section13.1,
page120).
6 Page and Menu Selection
SMA Solar Technology AG
User Manual 61HoMan_Portal-BA-en-20