Example: Behavior of the SunnyHomeManager when switching devices
On the Miele devices, e.g. a washing machine, you set the time the wash cycle must be completed
by. The SunnyHome Manager then determines the most economical time period to operate the
washing machine and starts the machine automatically. This ensures that the washing machine is
started on time so that the laundry is done at the desired time.
Requirements:
☐ You must have the user role Installer or PV System Administrator (see Section13.1,
page120).
Procedure:
1. Connect the load to the local network in which the SunnyHomeManager is located via the
Miele@home Gateway.
☑ The SunnyHomeManager detects the new load in the local network.
☑ The load is displayed on the page Device Overview > Overview of New Devices.
2. Use the configuration wizard to add the load to the SunnyHomeManager system as a system
extension.
☑ The new load is automatically displayed on the page Load Overview and Planning
with the available information and setting options.
3. Change the load name if necessary (see Section9.3.6, page82).
9 Load Control
SMA Solar Technology AG
User Manual 93HoMan_Portal-BA-en-20