SMA Solar Technology AG 7 Commissioning
Installation - Quick Reference Guide Off-Grid-IS-en-30 41
7.5 Testing the Generator
Requirement:
The Sunny Island must be in operation (see Section7.3 "Starting the System", page40).
Procedure:
1. Switch on the protective devices for the generator in the AC distribution board.
2. Connect the circuit breakers of the AC loads.
3. Close the load-break switch of the generator.
The generator starts.
Does the generator not start?
The generator management does not request the generator.
On the Sunny Remote Control, select the setting page Generator > Mode in user mode and set to Start.
This starts the generator manually (see the Sunny Island inverter operating manual).
The control cable connected does not transmit the start signal.
Eliminate faults in the wiring.
The generator is not ready for operation.
Find out possible causes using the manual from the manufacturer and eliminate these.
4. Check whether the parameter Generator > Power displays the feed-in power on the Sunny Remote Control in user
mode. This ensures that the Sunny Island has switched the stand-alone grid to the generator after completing the
warm-up time 234.12 GnWarmTm.
If no power is displayed after completion of the warm-up time, check the error messages:
Select the 410# Error active menu and rectify the cause of the displayed warning or error (see the Sunny Island
inverter operating manual).
7.6 Testing the Load Shedding
Requirements:
This system is not a multicluster system. Load shedding is part of the Multicluster Box in multicluster systems.
The Sunny Island must be in operation (see Section7.3 "Starting the System", page40).
Procedure:
1. Switch to installer mode on the Sunny Remote Control (see Section7.1, page39).
2. Select the parameter of the multifunction relay for the load-shedding contactor, e.g., 241.02 Rly2Op for the
Relay2 multifunction relay of the master.
3. Note the parameter value.
4. Set the parameter to Off.
The load-shedding contactor sheds the loads.
Does the load-shedding contactor not shed the loads?
The multifunction relay for triggering the load-shedding contactor was incorrectly configured.
Check the configuration and eliminate the fault.
There is a fault in the wiring of the load-shedding contactor.
Ensure that the multifunction relay is correctly wired.
5. Set the parameter to the setting that has been noted down.