SMA America, LLC The Sunny Island 5048U
Technical Description SI5048U-TUS121440 25
2.4 Required Tools and Resources
The following tools and materials are required in order to mount and install the
SunnyIsland5048‑US:
M 2 M6x10 mm screws and locking washers for connecting the Sunny
Island with the wall mounting bracket.
N1 Technical Description
O1 Test Report
P 2 4-pole print terminal for connecting the battery temperature sensor
and current sensor
Q 2 3-pole print terminal for the connection of relays 1 and 2
R 1 RS485 PiggyBack (optional)
S 2 RJ45 cable, white (optional)
Tools (not included in delivery)
Bootlace ferrules
Cable knife
Combination pliers
Crimping tool for terminal lugs (suitable for cable cross-sections of up to 2/0 AWG)
Diagonal cutting pliers
Drill
Drill bit (e.g. masonry or wood bit), fastener
3
/
8
in. or Ø 10 mm
Flat-head screwdriver 0.4 x
1
8
in. (2.5 mm) 1.0 x
3
8
in. (10 mm) /1.0 x
1
4
in. (5.5 mm)
Flathead screwdriver SZS 1.0 x 6.5
Hexagon‑socket wrench
1
8
in. bis
5
16
in. (3 mm to 8 mm)
Multimeter
Open-end/box wrenches or socket wrenches in the sizes 10/19/24/30
Phillips screwdriver, PH1 and PH2
Spirit level
Torque wrench 35 inlbs. 50 inlbs. (4 Nm 5 Nm) with flat-head screwdriver adapters in the sizes
3
8
in. /
1
4
in./
1
8
in. (10/5.5/2.5 mm) and SZS 1.0x 6.5
Insulation stripping tool
Marker Number Designation

Table of Contents