EasyManua.ls Logo

SMA SUNNY ISLAND 6048-US - Page 117

SMA SUNNY ISLAND 6048-US
240 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SMA America, LLC 14 Connecting External Sources
Technical description SI4548_6048-US-TB_en-13 117
Sunny Island connected in parallel to a 120 V generator
Sunny Island in the split-phase system to a 240 V generator
Generally the internal transfer relays of the slaves close only if the internal relay of the master is
closed.
Plants with master and slave unit on one battery (cluster operation) will keep on working if one slave
fails. If the master fails, the whole cluster stops its operation.

Table of Contents

Other manuals for SMA SUNNY ISLAND 6048-US

Related product manuals