EasyManua.ls Logo

SMA SUNNY ISLAND 6048-US - 8 Initial Start-Up; Requirements; Starting the Quick Configuration Guide (QCG)

SMA SUNNY ISLAND 6048-US
240 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SMA America, LLC 8 Initial Start-Up
Technical description SI4548_6048-US-TB_en-13 67
8 Initial Start-Up
8.1 Requirements
The Quick Configuration Guide (QCG) allows you to quickly and easily commission your off-grid
system. To do so, use the menu to select the 'right' system for you. The display then shows special
queries via which the system parameters can be set specifically.
8.2 Starting the Quick Configuration Guide (QCG)
The QCG is automatically activated during the initial start-up of the Sunny Island. In this case begin
with point 3. If the QCG is not activated automatically, begin with point 1.
Check the connections
• Before commissioning check all electrical connections for correct polarity.
• Ensure that all electrical connections are connected in accordance with the specifications
of this technical description.
Always save data
Always use the SD card to save data and events. In case of a failure SMA can thus help you
quickly.
• Always leave the SD card plugged in the Sunny Island.
• Plug the SD card into the card reader in the PC in order to read off the data and events.
Error occurrence
If the Sunny Island displays an error message, this must be remedied before the Sunny Island
is commissioned (see Section 20 "Troubleshooting", page 204).
Default setting of parameters
Upon starting the Quick Configuration Guide, viable parameter values are set by default.

Table of Contents

Other manuals for SMA SUNNY ISLAND 6048-US

Related product manuals