SMA Solar Technology America LLC 19 Parameter Lists
Operating Manual SI4548-6048-US-BE-en-21 163
133# Generator State
No. Name Description Value clear
text (No.)
Explanation
01 GnDmdSrc Source for generator
request
None (1) No request
Bat (2) Dependent on battery state of
charge
Lod (3) Load-dependent
Tim (4) Time-controlled
Run1h (5) Requested for 1 hour
Start (6) Manually started
ExtSrcReq (7) Requested via an external
source
02 GnStt Generator state Off (1) Off
Init (2) Init
Ready (3) Waiting for request (ready)
Warm (4) Warming up
Connect (5) Connecting
Run (6) Operation
Retry (7) Restarting
Disconnect (8) Split
Cool (9) Cooling down
Lock (10) Locked after error
Fail (11) Error
FailLock (12) Locked after error occurred.
03 GnRmgTm Remaining time of the
generator (minimum
run time) in hours,
minutes and seconds
04 GnRnStt Status generator
feedback on the master
Off (1) off
On (2) on