EasyManua.ls Logo

SMA SUNNY ISLAND 6048-US - Page 78

SMA SUNNY ISLAND 6048-US
244 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
9 Switching On and Off SMA Solar Technology America LLC
78 SI4548-6048-US-BE-en-21 Operating Manual
4. Switch on the Sunny Island as described in section (see Section9.1 "Switching On", page75).
5. Monitor the generator startup and check that the Sunny Island switches to charge mode.
6. Check for error-free functioning of all other energy generators in the system.
Charging the batteries
After recommissioning, it is important that the batteries are charged. If an autostart generator is
present in the stand-alone grid, the Sunny Island will request the generator after a few minutes.
Battery-preservation mode after recommissioning
If, after recommissioning, the Sunny Island immediately switches into battery-preservation mode
(see Section13.6 "Battery-Preservation Mode", page115), disconnect all loads from the AC
output.
The loads can be reconnected once the Sunny Island enters the state of charge. A precondition
for this is that a generator capable of providing the required power is connected (see
Section20.10 "Procedure during Emergency Charge Mode", page223).

Table of Contents

Other manuals for SMA SUNNY ISLAND 6048-US

Related product manuals