11 Troubleshooting
SMA Solar Technology AG
Operating manualSTP8-10-3AV-40-BE-en-1276
Event number Message, cause and corrective measures
901
PE connection missing > Check connection
The grounding conductor is not correctly connected.
Corrective measures:
Ensure that the grounding conductor is correctly connected.
1001
L / N swapped > Check connection
The connection of L and N is swapped.
Corrective measures:
Ensure that L and N are correctly connected.
1101
Installation fault > Check connection
A second line conductor is connected to N.
Corrective measures:
Connect the neutral conductor to N.
1302
Waiting for grid voltage > Installation failure grid connection > Check
grid and fuses
L or N not connected.
Corrective measures:
Ensure that L and N are connected.
Ensure that the circuit breaker is switched on.
Ensure that the AC cable is not damaged and that it is connected
correctly.
1501
Reconnection fault grid
The changed country data set or the value of a parameter you have set does
not correspond to the local requirements. The inverter cannot connect to the
utility grid.
Corrective measures:
Ensure that the country data set has been configured correctly. To do this,
select the parameter Set country standard and check the value.