EasyManua.ls Logo

SMA SUNNY TRIPOWER CORE1 - Page 93

SMA SUNNY TRIPOWER CORE1
114 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
11 Troubleshooting
SMA Solar Technology AG
Operating manual STP50-40-BE-en-15 93
Event number Message, cause and corrective measures
10110
Time synchronization failed: |xx|
No time information could be called up from the set NTP server.
Corrective measures:
Ensure that the NTP server was configured correctly.
Ensure that the inverter is integrated into a local network with Internet
connection.
10118
Parameter upload complete
The configuration file was loaded successfully.
10248
[Interface]: network busy
The network is busy. Data exchange between the devices is not at an optimum
and is greatly delayed.
Corrective measures:
Increase the query intervals.
If necessary, reduce the number of devices in the network.
10249
[Interface]: network overloaded
The network is overloaded. There is no data exchange between the devices.
Corrective measures:
Reduce the number of devices in the network.
If necessary, increase the data query intervals.
10250
[Interface]: package error rate [ok / high]
The package error rate has changed. If the package error rate is high, the net-
work is overloaded or the connection to the network switch or DHCP server
(router) is disturbed.
Corrective measures if the package error rate is high:
Ensure that with an Ethernet connection, the network cable and the
network connector are not damaged and that the network connectors are
correctly plugged.
If necessary, increase the data query intervals.
If necessary, reduce the number of devices in the network.

Table of Contents

Other manuals for SMA SUNNY TRIPOWER CORE1

Related product manuals