Drive Startup Manual HPV900-Induction
Page 6 © 2020 Smartrise Engineering, Inc. All Rights Reserved March 5, 2020
Enable Run box by setting the option in Setup |Miscellaneous | Enable Const. Box to
ON.
NOTE: When this option is ON, the onboard inspection buttons are disabled.
Connect a jumper from 24VDC to MM.
Verify the Car Door Bypass and Hoistway Bypass switches are in the OFF position.
Place the Inspection switch to INSPECTION.
Figure 4: Example of Construction Wiring