2-16
IInnssttaallllaattiioonn
aanndd
OOppeerraattiioonn
7. When desired amount of refrigerant has been transferred
into recovery tank, close virgin tank hand valve.
8. Allow recycler to run until 15”Hg vacuum is reached.
Then close blue service hose valve.
9. Turn vacuum/recycle valve OFF.
10. Turn compressor switch OFF.
33
33
Compare recovery tank pressure/temperature
relationship with the chart and bleed off any non-
condensables (air) by pressing PURGE button. Refer
to Purging Non-condensable Gas in this chapter.