13.4. Genset scheduler / Engine Exerciser Menu
There are 4
(1)
selectable engine exerciser programs that are set in order of priority on the display. Meaning that the program
“CUSTOM 1” is priority over the “CUSTOM 2” if both tests are scheduled to occur at the same time. This is to avoid
exercising a genset that is already being exercised.
(1)
Only for ATyS C65, ATyS C55 has 1 Custom engine exerciser program
GENERAL PARAMETERS includes a GENSET IDLE TIMEOUT setting, this setting dictates the time for which the
genset must be off before another automatic test can be launched (this includes automatic and manual starts on
the genset), if the amount of time congured has not passed the Custom test will not be launched. As standard this
parameter is set to 0min to follow strictly the custom programs and can be congured up to 60 000min.
For each program (CUSTOM 1-4), the following settings can be dened individually:
- Type of test: type of test that will be performed on this program
TEST ON LOAD / LOAD TEST: will perform a full test including all the timers and operating the switch (full cycle).
Note: on all switches, a TEST ON LOAD will cause a load supply blackout when testing the transfer function.
TEST OFF LOAD / NO LOAD TEST: will perform a genset start for the dened time, and a genset stop after the time elapses.
Nothing / NOT USED
- Periodicity: every how often will the program take place. It can be set yearly, semi-yearly (every 6 months), bimonthly (every 2
months), monthly, 28 days, biweekly (every 2 weeks), weekly, every 2 days, daily or NON CYCLIC (no repetition, single use).
- Test Duration: the time the generator will run with the load before transferring back to priority source (for example,
15minutes).
WARNING ! If using “Manual retransfer” specic function, the transfer to the main source will not take place
when the test ends, but it will wait user validation to retransfer.
- Starting time&date: the date&hour when this periodic program will start (for example, starting on January 5th at 1pm).
(date and hour when rst TEST will take place)
*Example:
- TYPE: TEST ON LOAD
- PERIODIC SCHEDULE: MONTHLY
- TEST DURATION (s): 900 (15min)
- START DATE: 05/01/21
- START TIME : 13:00