ATySgM - 542933D - SOCOMEC
38 EN
13.4.2. Three phase version
The LED signalling and operation is only active when the product supply is available.
To set the dip switches, it is necessary to open the Auto/Manual cover.
Commissioning must always result in having at least 1 LED source available on.
(Therefore, the voltage and frequency must be within the dened thresholds).
Any action on the potentiometers will change the settings, even when the cover is closed.
A
Dip switch settings
B
Source voltage supply
conguration
C
Timer settings
Type of network: A-B
A: 3P
B: 1P
Frequency: C-D
C: 50 Hz
D: 60 Hz
Stop in 0 position: E-F
E: No stop in O position
F: 2s stop in O position
Type of application: G-H
G: Network - Genset
H: Network - Network
Loss of priority source timer
FT
FT: 0-60 sec.
U/F
[HYST]
[HYST]
Return of priority sourcetimer
RT
RT: 0-30 min.
U/F
127/230 Vac
version
Un (P-P):
208-240 Vac
Un (P-N):
120-138 Vac
230/400 Vac
version
Un (P-P):
380-420 Vac
Un (P-N):
220-240 Vac
HYST: 20 %ΔU/F
ΔU: 5-20%
ΔF: 3-10%
D
LED info
Source availability LED
Source LED ON LED OFF LED blinking
Source 1 available
Source 1 not available
or out of range
- a timer is counting down
- test mode
Source 2 available
Source 2 not available
or out of range
- a timer is counting down
Fault reset
Fault and state of the product LED's
LED ON LED OFF LED blinking
Fault
Product OK or
S1-S2not available
Please wait
Auto mode Manual mode Manual retransfer
CDT and DTT timers are xed:
Genset cooling time : 4min and validation of secondary network / backup source stability = 5 sec.