Green Power 2.0 320 to 400 kVA - Ref.:
INMGP2401210-GB_12
4.2-2
4.2-3
4.2-4 4.2-5
• Several cabinets can be installed adjacent to each other (figure 4.2-2).
• Two Green Power 2.0 320-400 kVA can be installed back to back (figure 4.2-3).
• Observe the direction of the ventilation flows (figure 4.2-4) and heat dispersion flows (figure 4.2-5). See chap-
ter 9 for the technical specifications relating to the required ventilation values.
For fixing on the floor, see § 5. 6 and § 10. 1 Plan 1
4. RequiSiteS
In order to profit from an optimal ventilation, the side panels must remain in place
Ventilation.
Climate control.
Green Power
2.0
BATTERY
CABINET
BATTERY
CABINET
Green Power
2.0
Green Power
2.0
Green Power
2.0
COOL
AIR
WARM
AIR
Green Power
2.0
CLIMATE CONTROL
COOL
AIR
WARM
AIR
Green Power
2.0
CLIMATE CONTROL
Green Power
2.0

Table of Contents

Other manuals for socomec Green Power 2.0

Related product manuals