23
ENGLISH
Green Power 2.0 320 to 400 kVA - Ref.:
INMGP2401210-GB_12
A
C
B
D
795 mm
845 mm
650 mm
13
14
75 mm
80 mm
80 mm
13
14
75 mm
600 mm
47 mm
115 mm
600 mm
53.5 mm
700 mm
53.5 mm
700 mm
1407 mm
Dimensional tolerances per cabinet: ± 2mm
5. 6.
fIxIng to the floor (a raIseD floor or DIrectly to the floor)
Each foot of the cabinet needs to be linked up to the metallic mesh network (if the cabinet is on a raised oor) or
to have direct earth bonding (if the cabinet is directly positioned on the oor) by using short links with a cross-
section ≥ 35 mm².
Use braidings to connect all the metallic feet of the raised oor and guarantee equipotential cabling.
Each foot has a oor xing hole (labelled A : ø 13) and welded nut for level adjusting (labelled B : screw THM
12 not supplied).
5. 7.
For batteries on racks or in cabinets, the cabinet must be fixed to the floor to prevent it from falling
over. Each cabinet is fitted with pre-drilled feet - See § 5.6.
feet of battery cabinet: same as Green Power 2.0 feet. (See § "10. 7. Plan 7: Battery Floor xing")
When the battery cabinet is installed, cut and remove the plastic fastening of battery cells in order to
release the safety valve
5. 8.