Before carrying out work on the terminal board or on UPS internal parts, ensure that Green Power 2.0
is switched off, remove the power supply, open the external battery cabinet disconnectors, isolate the
system and wait 5 minutes.
The connecting bars are made of copper!
Use only copper cables or cables with tinned eyelets for the connections.
5. 10.2. Connections if the MAINS and AUX MAINS are connected IN COMMON
5. 10.1. Connections if the MAINS and AUX MAINS are connected SEPARATELY