EasyManua.ls Logo

socomec Green Power 2.0 - UPS MEASUREMENTS

socomec Green Power 2.0
54 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
25
ENGLISH
Green Power 2.0 320 to 400 kVA - Ref.:
INMGP2401210-GB_12
5. 10-3
X10
X40
5. 10.2-1
*
5. 10-1
5. 10-2
5. 10.1-1
5. 10.2--2
5. 10.
InstallatIon proceDures anD InstructIons
Before carrying out work on the terminal board or on UPS internal parts, ensure that Green Power 2.0
is switched off, remove the power supply, open the external battery cabinet disconnectors, isolate the
system and wait 5 minutes.
The connecting bars are made of copper!
Use only copper cables or cables with tinned eyelets for the connections.
5. 10.2. Connections if the MAINS and AUX MAINS are connected IN COMMON
5. 10.1. Connections if the MAINS and AUX MAINS are connected SEPARATELY
5. inStallation
N L1 L2 L3L1 L2 L3 N L1 L2 L3
AUX MAINSMAINS OUTPUT
NN L1L1 L2L2 L3L3
X10
X40 X50
MAINS
OUTPUT
* Optional
OPEN
X50
X40X10

Table of Contents

Other manuals for socomec Green Power 2.0

Related product manuals