UNIT N
5. 10.3. Unit connection in C3
5. 10.4. Connection input from above
In order to be able to connect using a cable from above, we offer a arrival from the top cabinet.
It must be positioned to the right of Green Power 2.0.
Toensuretherequiredventilation,allcabinetshouldbettedwithsupportfeet(optional)
INPUT TO RECTIFIER AND BYPASS MAINS
TO LOAD
5. 10.5. Centralised Bypass connection in C3
PkVA Name Designation
Copper
termination
0 hole
Screw
Max cross
section
Coupling
torque
200
à
800
X45/L
Unit input
100 x 5 mm 3 x 13 M12 2x 3 x 240 mm² 70 Nm
X45/N 185 x 5 mm 5 x 13 M12 5 x 240 mm² 70 Nm
X40 Mains input 185 x 5 mm 4 x 13 M12 4 x 240 mm² 70 Nm
X50 Load output 185 x 5 mm 4 x 13 M12 4 x 240 mm² 70 Nm
PE Protective conductor 50 x 5 mm 6 x 13 M12 6 x 150 mm² 70 Nm
900
à
1200
X45/L
Unit input
100 x 10 mm 3 x 13 M12 2x 3 x 240 mm² 70 Nm
X45/N 100 x 10 mm 10 x 13 M12 2x 10 x 240 mm² 70 Nm
X40 Mains input 100 x 10 mm 4 x 15 M14 2x 4 x 240 mm² 110 Nm
X50 Load output 100 x 10 mm* 4 x 15 M14 2x 4 x 240 mm² 110 Nm
PE Protective conductor 50 x 5 mm* 6 x 13 M12 6 x 240 mm² 70 Nm
*Copper extension terminals (100x10, 7 holes *13) are to be moved from X40 to X50 if cable input is from the top.
MAINS
OUTPUT