Green Power 2.0 320 to 400 kVA - Ref.:
INMGP2401210-GB_12
4.2-1
≥ 40 cm
4. 2.
envIronmental requIsItes
• Green Power 2.0 is not designed for outdoor use.
• Do not expose Green Power 2.0 to direct sunlight or to sources of excessive heat.
• The recommended operating temperature, humidity and altitude values are listed in the technical specica-
tions table (see chapter 9). Cooling systems may be required to maintain these values.
• Green Power 2.0 must be installed in an environment without obstructions and which is dry, clean and dust-
free.
• Avoid dusty environments or areas where there is dust from conductive or corrosive materials (e.g. metal dust
or chemical solutions).
• Green Power 2.0 can be installed against a wall; the distance will depend on the cables present. The upper
part of Green Power 2.0 must be positioned at least 40 cm away from the ceiling (gure 4.2-1).
• Green Power 2.0 switches are accessed from the front; however, a space of at least 1.5 metres should be left
at the front of Green Power 2.0 for maintenance purposes.
• For UPSs arranged frontally, leave a minimum space of 210 cm between the two cabinets so as to allow a pas-
sageway when both doors are open (in accordance with the provisions of standard IEC 60364 - see gure 4.2-1).
4. RequiSiteS
Green Power 2.0 should only be installed on a concrete surface or other non-combustible surface.
≥ 210 cm
between the doors
Green Power 2.0 Green Power 2.0